Industry veteran brings nearly 30 years of experience as company expands full-service plumbing and sewer capabilities ...
Arbyrd council backs $52,000 well repair loan, weighs sales tax hike for future infrastructure, and passes new mobile home ...
The Insurgentes Collector is among a host of projects slated for upgrades under an agreement between the Trump administration and Mexico to solve the Tijuana River pollution crisis.
Contact with the ocean is still off limits near the site of a spill that occurred during a storm on Christmas Eve.
Ten thousand gallons of untreated wastewater were absorbed into the ground after a sewer pipe cracked, Riverhead official says.
NAHANT— The town of Nahant has received over $1 million from Congressman Seth Moulton’s administration that goes directly into local water and wastewater infrastructure projects.  Moulton announced ...
Work is ongoing in Ballard as part of the Ship Canal Water Quality Project, with work continuing on 24th Ave NW and at the ...
East Beach near Mission Creek continues to remain off limits to the public weeks after a sewage spill following holiday ...
Mayor Dean Trantalis says he does not want to see a long-awaited downtown park marred by a massive sewage lift station. It ...
HOLTS SUMMIT -- A pump responsible for sending sewage from Holts Summit to Jefferson City is damaged. Mitch Ash, Holt Summit ...
A sewer pipe break near a East Main Street construction site caused up to 10,000 gallons of untreated wastewater to flow into ...